How long does a bathroom renovation take?

A full renovation of a standard bathroom usually takes 2–3 weeks from strip-out to final clean. A simpler refresh in the same layout can take 1–2 weeks. A wet room, or a bathroom where the toilet or shower is moving, can take 3–4 weeks.

Downstairs WC decorated, with a tiled half-wall
Downstairs WC decorated, with a tiled half-wall. A recent job by YSE Renovations.

A typical timeline

Stage What happens Typical time
1. Strip-out Old suite, tiles and flooring removed and taken away 1–2 days
2. First fix Plumber and electrician run new pipes and cables 1–3 days
3. Walls and floor Boarding, plastering and repairs to the floor 2–3 days
4. Waterproofing Shower area tanked and left to cure 1–2 days
5. Tiling Walls and floor tiled and grouted 3–5 days
6. Second fix Bath or shower, toilet, basin, taps and towel rail fitted 1–2 days
7. Finishing Sealant, decorating, final checks and clean 1–2 days

Some stages need drying or curing time before the next one starts, so the days don't always run back to back.

What causes delays

  • Hidden problems: rotten floorboards, old pipework or water damage found once the old bathroom comes out
  • Products not arriving: order the suite, tiles and taps before work starts
  • Changing the layout: moving the toilet or shower means extra plumbing and sometimes new drainage
  • Decisions mid-job: choosing tiles or fittings after work has started

Living without a bathroom

If it's your only bathroom, ask for the toilet to be reconnected at the end of each day where possible, and plan showers at the gym, work or with family for the tiling stage.

Get a free quote

YSE Renovations manages bathroom renovations from strip-out to the final clean, bringing in a qualified plumber and electrician for those parts of the job. You get one point of contact and a written timeline before we start. We're a father-and-son team based in Colindale, covering all of London.

Call or WhatsApp 07460 351689 for a free, itemised written quote.

Prices are a guide for 2026 and include materials unless stated. Every job gets a free, itemised written quote before work starts.

Related guides

More on bathrooms & tiling

Our service

Bathrooms & tiling in London

Ready for a free quote?

Tell us about the job and we'll come back with questions and a clear, written quote.